MCP
BC

B. Constance

3 papers in the library

Papers

3
Updated baseline for a staged Compact Linear Collider
CLICCLICdp collaborations…B. Constance
The Compact Linear Collider (CLIC) is a multi-TeV e+e- collider planned for staged construction. This report presents an updated baseline scenario, optimized for physics output, cost, and power, with three centre-of-mass energy stages: 380 GeV, 1.5 TeV, and 3 TeV over 22 years. The first stage uses X-band klystrons as an alternative to the drive beam scheme, focusing on precision Higgs and top-quark measurements.
arXivarXiv · · August 26, 2016
0
192
Present status and first results of the final focus beam line at the KEK Accelerator Test Facility
P. BambadeM. Alabau Pons…B. Constance
The ATF2 final-focus test beam line at KEK, constructed to focus a low-emittance beam from the ATF damping ring to a vertical size of about 37 nm and demonstrate nanometer-level stability, began beam commissioning in December 2008 using advanced diagnostics and feedback tools. The paper reports the present status and first results from this commissioning, supported by an international team.
arXivarXiv · · July 5, 2012
0
65
Latest Beam Test Results of the FONT4 ILC Intra-train Feedback System Prototype
P.N. BurrowsR. ApsimonG.B. ChristianC. ClarkeB. ConstanceH.Dabiri KhahT. HartinA. KalininC. PerryJ. Resta LopezC. Swinson
The FONT4 prototype is a digital intra-train feedback system designed for the International Linear Collider's interaction point. It comprises a custom analogue front-end, FPGA-based digital signal processing, and a kicker drive amplifier. Tested on the KEK Accelerator Test Facility's extraction line, the system achieved a measured latency of approximately 140 ns, demonstrating its suitability for fast beam stabilization.
arXivarXiv · · March 4, 2009
0
Frequent collaborators
R. Apsimon (3)
P.N. Burrows (3)
C. Perry (3)
P. Bambade (2)
A. Jeremie (2)
A. Aryshev (2)
T. Tauchi (2)
J. Urakawa (2)
A. Faus-Golfe (2)
Y. Renier (2)
D. Schulte (2)
M. Wendt (2)