Centralised Design and Production of the Ultra-High Vacuum and Laser-Stabilisation Systems for the AION Ultra-Cold Strontium Laboratories
B. StrayO. EnnisS. HedgesS. DeyM. LangloisK. BongsS. LellouchM. HolynskiB. BostwickJ. ChenZ. EylerV. Gibson +60
B. Stray
O. Ennis
S. Hedges
S. Dey
M. Langlois
K. Bongs
S. Lellouch
M. Holynski
B. Bostwick
J. Chen
Z. Eyler
V. Gibson
+72
This paper describes the centralised design and production of the ultra-high vacuum sidearm and laser-stabilisation systems for the AION Ultra-Cold Strontium Laboratories. Commissioning data confirm residual gas and steady-state pressures, magnetic field quality, laser stabilisation, and 3D magneto-optical trap loading rates. The streamlined approach allowed five laboratories to be built in parallel within 24 months and could serve as a model for other cold atom experiments.

arXiv ·
· May 31, 2023