Status of the warm front end of PIP-II injector test
A. ShemyakinM. AlvarezR. AndrewsC. BaffesJ.-P. CarneiroA. ChenP.F. DerwentJ.P. EdelenD. FrolovB. HannaL. ProstA. Saini +6
A. Shemyakin
M. Alvarez
R. Andrews
C. Baffes
J.-P. Carneiro
A. Chen
P.F. Derwent
J.P. Edelen
D. Frolov
B. Hanna
L. Prost
A. Saini
+18
The Proton Improvement Plan II (PIP-II) at Fermilab includes a test accelerator, the PIP-II Injector Test (PIP2IT), to validate the front-end concept of a CW-compatible pulsed H⁻ SRF linac. PIP2IT comprises a 10 mA DC, 30 keV H⁻ ion source, a 2 m LEBT, a 2.1 MeV CW RFQ, a MEBT, two cryomodules reaching ~25 MeV, and a HEBT. The ion source, LEBT, RFQ, and initial MEBT have been built and commissioned. This report presents the overall status of the warm front end.

arXiv ·
· March 23, 2018