MCP
CB

C. Baffes

12 papers in the library

Papers

12
Test Results of PIP2IT MEBT Vacuum Protection System
A. ChenR. AndrewsC. BaffesD. LambertL. ProstA. ShemyakinT. Zuchnik
The paper reports the design and test results of a vacuum protection system for the PIP-II MEBT line, which prevents gas from entering the superconducting SRF linac during a vacuum failure. The system uses a fast-closing valve, two sensors, and a differential pumping insert. A prototype installed in the PIP2IT accelerator was successfully tested in several failure modes.
arXivarXiv · · December 5, 2019
0
Commissioning and Operation of FAST Electron Linac at Fermilab
A. RomanovC. BaffesD.R. BroemmelsiekK. CarlsonD.J. CrawfordN. EddyD. Edstrom Jr.E.R. HarmsJ. HurdM. KuceraJ. LeibfritzI. Rakhno  +8
The paper reports the commissioning and first operation of a 1.3 GHz superconducting RF electron linac at Fermilab's FAST facility. The main achievement is a maximum beam energy of about 300 MeV, with a record 250 MeV energy gain from the ILC-type SRF cryomodule, achieved using a photoinjector producing 200 pC bunches at 3 MHz within 1 Hz trains. The report covers tuning of the SRF cryomodule and beam optics, and highlights parasitic experiments on wake-fields and advanced beam phase space manipulation.
arXivarXiv · · November 9, 2018
0
10
PIP-II Injector Test Warm Front End: Commissioning Update
L. ProstR. AndrewsC. BaffesJ.-P. CarneiroB. ChaseA. ChenE. CullertonP.F. DerwentJ.P. EdelenJ. Einstein-CurtisD. FrolovB. Hanna  +10
The Proton Improvement Plan II (PIP-II) Injector Test Warm Front End (WFE) at Fermilab has been commissioned to full length, including a 30-keV H- source, LEBT, 2.1 MeV CW RFQ, and MEBT with diagnostics. The central achievement is the successful transport of a beam meeting Booster injection requirements (5 mA, 0.55 ms macro-pulse at 20 Hz) through the WFE, as confirmed by MEBT beam measurements.
arXivarXiv · · June 14, 2018
0
Preliminary Modeling Of Radiation Levels At The Fermilab PIP-II Linac
L. LariF. CeruttiL.S. EspositoC. BaffesS.J. DixonN.V. MokhovI. RakhnoI.S. Tropin
This paper presents a preliminary Monte Carlo estimation of radiation levels in the gallery of the Fermilab PIP-II 800-MeV superconducting linac, assuming an operational beam loss limit of 0.1 W/m. Using FLUKA and MARS15 codes, the calculation supports the civil engineering and mechanical integration design of the new tunnel, service buildings, and transfer line to the Booster.
arXivarXiv · · June 14, 2018
0
Commissioning And First Results From The Fermilab Cryomodule Test Stand
E.R. HarmsM. AwidaC. BaffesK. CarlsonS. ChandrasekaranB. ChaseE. CullertonJ. EdelenJ. Einstein-CurtisC. GinsburgA. GrassellinoB. Hansen  +25
A new cryomodule test stand, CMTS1, for Superconducting Radiofrequency (SRF) cavities has been commissioned at Fermilab. The first device tested is the prototype 1.3 GHz cryomodule assembled for LCLS-II. The paper reports the facility's demonstrated capabilities, commissioning steps, first test results, and future plans.
arXivarXiv · · May 7, 2018
0
5
Status of the warm front end of PIP-II injector test
A. ShemyakinM. AlvarezR. AndrewsC. BaffesJ.-P. CarneiroA. ChenP.F. DerwentJ.P. EdelenD. FrolovB. HannaL. ProstA. Saini  +6
The Proton Improvement Plan II (PIP-II) at Fermilab includes a test accelerator, the PIP-II Injector Test (PIP2IT), to validate the front-end concept of a CW-compatible pulsed H⁻ SRF linac. PIP2IT comprises a 10 mA DC, 30 keV H⁻ ion source, a 2 m LEBT, a 2.1 MeV CW RFQ, a MEBT, two cryomodules reaching ~25 MeV, and a HEBT. The ion source, LEBT, RFQ, and initial MEBT have been built and commissioned. This report presents the overall status of the warm front end.
arXivarXiv · · March 23, 2018
0
Installation Progress At The PIP-II Injector Test At Fermilab
C. BaffesM. AlvarezR. AndrewsA. ChenJ. CzajkowskiP. DerwentJ. EdelenB. HannaB. HartsellK. KendzioraD. MitchellL. Prost  +5
The paper reports on the installation progress of the PIP-II Injector Test (PXIE) at Fermilab, a test accelerator for the planned PIP-II H- superconducting linac. It describes the warm front-end comprising a 10 mA DC, 30 keV H- ion source, a 2 m LEBT, a 2.1 MeV CW-capable RFQ, and a 10 m MEBT, focusing on the installation of the RFQ, first MEBT sections, and related mechanical design considerations.
arXivarXiv · · January 4, 2017
0
0
The Use of KF Style Flanges In Low Particulate Applications
K.R. KendzioraJ. AngeloC. BaffesD. FranckR. Kellett
This paper proposes KF-style flanges for temporary diagnostic connections in SCRF particle accelerators, where low-particulate vacuum systems are critical. Tests compare particles generated during assembly of KF flanges versus the widely accepted conflat flanges. The results show KF flanges produce comparable or fewer particles, offering a more time-efficient alternative for temporary attachments.
arXivarXiv · · January 3, 2017
0
Status of the warm front end of PXIE
A. ShemyakinM. AlvarezR. AndrewsC. BaffesA. ChenB. HannaL. ProstG. SaewertV. ScarpineJ. SteimelD. SunD. Li  +1
This paper reports the status of the warm front end of the PXIE test accelerator, which validates a CW-compatible, pulsed H- superconducting linac front end for upgrading Fermilab's injection complex. It presents commissioning results of a partially assembled low-energy beam transport (LEBT) line, the manufacturing status of a 2.1 MeV CW radio-frequency quadrupole (RFQ), and the development of the medium-energy beam transport (MEBT), particularly its chopping system elements for creating various bunch structures.
arXivarXiv · · February 5, 2015
0
High power density test of PXIE MEBT absorber prototype
A. ShemyakinC. Baffes
The Medium Energy Beam Transport (MEBT) absorber for the PXIE program must withstand a 21 kW beam focused to a ~2 mm rms radius. Two prototypes made of molybdenum alloy TZM were tested with a 28 keV DC electron beam at the required peak surface power density of 17 W/mm². The paper reports the measured temperatures and flow parameters, compared to analysis, and presents the key results from these high power density tests.
arXivarXiv · · February 5, 2015
0
Design of MEBT for the Project X Injector Experiment at Fermilab
A. ShemyakinC. BaffesA. ChenY. EidelmanB. HannaV. LebedevS. NagaitsevJ.-F. OstiguyR. PasquinelliD. PetersonL. ProstG. Saewert  +7
This paper presents the Medium Energy Beam Transport (MEBT) design for the Project X Injector Experiment (PXIE) at Fermilab, which will form a 1 mA H- beam with an arbitrary selected bunch pattern from a 5 mA, 162.5 MHz CW train. The MEBT at 2.1 MeV diverts undesired bunches to an absorber using kickers; the development of these elements is described.
arXivarXiv · · January 31, 2013
0
Mechanical Design of a High Energy Beam Absorber for the Advanced Superconducting Test Accelerator (ASTA) at Fermilab
C. BaffesM. ChurchJ. LeibfritzS. OpltI. Rakhno
This paper presents the mechanical design of a high-energy beam absorber for the Advanced Superconducting Test Accelerator (ASTA) at Fermilab, focusing on the thermal design and analysis. The absorbers must handle a 75 kW electron beam at 1.5 GeV, the facility's ultimate configuration with six cryomodules. They consist of water-cooled graphite, aluminum, and copper layers in a helium-filled enclosure. Potential radiation-induced degradation of the graphite is also discussed.
arXivarXiv · · January 23, 2013
0
Frequent collaborators
A. Shemyakin (7)
A. Chen (6)
L. Prost (6)
R. Andrews (5)
B. Hanna (5)
V. Scarpine (5)
D. Sun (5)
G. Saewert (4)
J. Steimel (4)
J. Leibfritz (3)
I. Rakhno (3)
A. Warner (3)