MCP
LP

L. Prost

20 papers in the library

Papers

20
Experience With Machine Protection Systems At PIP2IT
PIP-II CollaborationA. WarnerM. AustinL. CarmichaelJ.-P. CarneiroB. HannaE. HarmsR. NeswoldL. ProstR. RiveraA. ShemyakinM. Ibrahim  +1
This paper reports the machine protection system (MPS) commissioned at the PIP2IT accelerator test facility, which accelerated a 0.55 ms × 20 Hz × 2 mA H⁻ beam to 16 MeV. The MPS could interrupt the beam within 10 μs upon detecting excessive beam loss, protecting beamline elements. The authors describe the system architecture, loss detection methods, beam interruption procedure, and operational experience from PIP2IT.
arXivarXiv · · September 2, 2022
0
Beam Dynamics Studies at the PIP-II Injector Test Facility
J.-P. CarneiroB. HannaE. PodzeyevL. ProstA. SainiA. Shemyakin
This paper presents beam dynamics measurements at the PIP-II Injector Test Facility (PIP2IT), which validates the front-end concept of the PIP-II linac at Fermilab. Measurements include Twiss parameters via Allison scanners, beam envelopes, and transverse and longitudinal rms emittance reconstruction. These results are compared with predictions from the Tracewin beam dynamics code, testing the facility's design performance.
arXivarXiv · · August 24, 2022
0
Experience with Long-pulse Operation of the PIP2IT Warm Front End
A. ShemyakinJ.-P. CarneiroA. ChenD. FrolovB. HannaR. NeswoldL. ProstG. SaewertA.SainiV. ScarpineA. WarnerJ.-Y. Wu  +1
The warm front end of the PIP2IT accelerator, a prototype for the proposed PIP-II, was operated at 5 kW average beam power (2.1 MeV × 5 mA × 25 ms × 20 Hz) to emulate the 1.1% duty factor of the future machine. The main contribution is the documentation of operational difficulties and the solutions implemented to achieve this power level, informing the design of the PIP-II injector.
arXivarXiv · · December 6, 2019
0
Measurements of a 2.1 MeV H−^- beam with an Allison scanner
C. RichardJ.-P. CarneiroB. HannaL. ProstA. SainiV. ScarpineA. Shemyakin
An Allison scanner measured the transverse 2D phase-space distribution of a 2.1 MeV, 5 mA H⁻ beam at Fermilab’s PIPIT accelerator. In action-phase coordinates, the core’s intensity decays exponentially with action and is phase-independent, while the tail (10–30% of the beam) decays slower and exhibits phase dependence as two branches. Measurements show no emittance dilution along the main beamline and that scraping removes these branches, effectively reducing transverse tails.
arXivarXiv · · December 6, 2019
0
Test Results of PIP2IT MEBT Vacuum Protection System
A. ChenR. AndrewsC. BaffesD. LambertL. ProstA. ShemyakinT. Zuchnik
The paper reports the design and test results of a vacuum protection system for the PIP-II MEBT line, which prevents gas from entering the superconducting SRF linac during a vacuum failure. The system uses a fast-closing valve, two sensors, and a differential pumping insert. A prototype installed in the PIP2IT accelerator was successfully tested in several failure modes.
arXivarXiv · · December 5, 2019
0
Experimental Study of Beam Dynamics In The PIP-II MEBT Prototype
A. ShemyakinJ.-P. CarneiroB. HannaV. LebedevL. ProstA. SainiV. ScarpineV.L.S. SistaC. Richard
This paper presents experimental measurements of beam dynamics in the prototype Medium Energy Beam Transport (MEBT) for the PIP-II linac at Fermilab. Transverse and longitudinal beam parameters were characterized for RFQ currents of 1-10 mA using 10 $\mu$s pulses. Key measurements include transverse optics via differential trajectories, beam envelope reconstruction with scrapers and an Allison emittance scanner, and bunch length measurements with a Fast Faraday Cup. These results address the stringent beam envelope and loss requirements imposed by the MEBT chopping system.
arXivarXiv · · August 24, 2018
0
PIP-II Injector Test Warm Front End: Commissioning Update
L. ProstR. AndrewsC. BaffesJ.-P. CarneiroB. ChaseA. ChenE. CullertonP.F. DerwentJ.P. EdelenJ. Einstein-CurtisD. FrolovB. Hanna  +10
The Proton Improvement Plan II (PIP-II) Injector Test Warm Front End (WFE) at Fermilab has been commissioned to full length, including a 30-keV H- source, LEBT, 2.1 MeV CW RFQ, and MEBT with diagnostics. The central achievement is the successful transport of a beam meeting Booster injection requirements (5 mA, 0.55 ms macro-pulse at 20 Hz) through the WFE, as confirmed by MEBT beam measurements.
arXivarXiv · · June 14, 2018
0
Low Emittance Growth in a LEBT with Un-Neutralized Section
L.ProstJ.-P. CarneiroA. Shemyakin
This paper proposes that emittance growth in a Low Energy Beam Transport line (LEBT) can be suppressed by keeping the beam un-neutralized in the section containing the chopper, provided the transition occurs where the beam has low transverse tails. The scheme avoids the pulse-start neutralization variation that causes Twiss parameter drift and beam losses. An experiment at Fermilab's PIP2IT demonstrated low emittance dilution for a 5 mA, 30 keV $H^{-}$ beam.
arXivarXiv · · May 4, 2018
0
Status of the warm front end of PIP-II injector test
A. ShemyakinM. AlvarezR. AndrewsC. BaffesJ.-P. CarneiroA. ChenP.F. DerwentJ.P. EdelenD. FrolovB. HannaL. ProstA. Saini  +6
The Proton Improvement Plan II (PIP-II) at Fermilab includes a test accelerator, the PIP-II Injector Test (PIP2IT), to validate the front-end concept of a CW-compatible pulsed H⁻ SRF linac. PIP2IT comprises a 10 mA DC, 30 keV H⁻ ion source, a 2 m LEBT, a 2.1 MeV CW RFQ, a MEBT, two cryomodules reaching ~25 MeV, and a HEBT. The ion source, LEBT, RFQ, and initial MEBT have been built and commissioned. This report presents the overall status of the warm front end.
arXivarXiv · · March 23, 2018
0
Characterization of the beam from the RFQ of the PIP-II Injector Test
A. ShemyakinJ.-P. CarneiroB. HannaL. ProstA. SainiV. ScarpineV.L.S. SistaJ. Steimel
The PIP-II Injector Test at Fermilab has commissioned a 2.1 MeV, 10 mA CW RFQ. Measurements of the beam after acceleration characterize its energy and emittance, providing the first experimental data on the RFQ output beam properties.
arXivarXiv · · September 21, 2017
0
PIP-II Injector Test's Low Energy Beam Transport: Commissioning and Selected Measurements
A. ShemyakinM. AlvarezR. AndrewsJ.-P. CarneiroA. ChenR. D'ArcyB. HannaL. ProstV. ScarpineC. Wiesner
The PIP2IT test accelerator at Fermilab has commissioned its ion source and Low Energy Beam Transport (LEBT) in the initial straight configuration, achieving full specification parameters. This paper describes the LEBT design and reports the commissioning results.
arXivarXiv · · April 27, 2017
0
Low Emittance Growth In a LEBT With Un-Neutralized Section
L. ProstJ.-P. CarneiroA. Shemyakin
The paper shows that emittance growth in a Low Energy Beam Transport (LEBT) line can be suppressed by keeping the beam un-neutralized in the section containing the chopper, instead of relying on neutralization from background gas ionization. This alternative works for modest beam perveance, provided the transition to the un-neutralized section occurs where the beam has low transverse tails. The scheme was experimentally realized at Fermilab's PXIE, where low beam emittance dilution was demonstrated.
arXivarXiv · · April 18, 2017
0
The PXIE LEBT Design Choices
L. ProstA. Shemyakin
The PXIE LEBT design is guided by the principle of allowing un-neutralized beam transport over a significant portion of the line, for both pulsed and DC operation, in contrast to typical LEBT practice. This design choice is a compromise that shapes the overall beam line, with the rationale presented in terms of the guiding principles and trade-offs that lead to the final configuration for the PXIE front-end.
arXivarXiv · · April 14, 2017
0
Installation Progress At The PIP-II Injector Test At Fermilab
C. BaffesM. AlvarezR. AndrewsA. ChenJ. CzajkowskiP. DerwentJ. EdelenB. HannaB. HartsellK. KendzioraD. MitchellL. Prost  +5
The paper reports on the installation progress of the PIP-II Injector Test (PXIE) at Fermilab, a test accelerator for the planned PIP-II H- superconducting linac. It describes the warm front-end comprising a 10 mA DC, 30 keV H- ion source, a 2 m LEBT, a 2.1 MeV CW-capable RFQ, and a 10 m MEBT, focusing on the installation of the RFQ, first MEBT sections, and related mechanical design considerations.
arXivarXiv · · January 4, 2017
0
0
Pxie low energy beam transport commissioning
L. ProstM. AlvarezR. AndrewsJ.-P. CarneiroB. HannaV. ScarpineA. ShemyakinR. D'ArcyC. Wiesner
This paper reports the commissioning of the PXIE low-energy beam transport (LEBT) at Fermilab, which delivers a 10 mA, 30 keV H⁻ beam. The LEBT, containing three solenoids, clearing electrodes, and a chopper, achieved full specification parameters. The central contribution is the measurement of transverse phase-space at the beam-line exit under different neutralization schemes, controlled by varying electrode biases and chopper settings, validating the LEBT design for the PIP-II front end.
arXivarXiv · · November 4, 2015
0
Scheme for Low Energy Beam Transport with a non-neutralized section
A. ShemyakinL. Prost
This paper proposes a LEBT scheme where a downstream section is deliberately left un-neutralized, contrary to the conventional design of full space-charge neutralization. The authors argue that for beams with modest perveance and uniform current density from the source, this non-neutralized portion does not cause significant emittance growth, thereby simplifying the LEBT design.
arXivarXiv · · April 23, 2015
0
Status of the warm front end of PXIE
A. ShemyakinM. AlvarezR. AndrewsC. BaffesA. ChenB. HannaL. ProstG. SaewertV. ScarpineJ. SteimelD. SunD. Li  +1
This paper reports the status of the warm front end of the PXIE test accelerator, which validates a CW-compatible, pulsed H- superconducting linac front end for upgrading Fermilab's injection complex. It presents commissioning results of a partially assembled low-energy beam transport (LEBT) line, the manufacturing status of a 2.1 MeV CW radio-frequency quadrupole (RFQ), and the development of the medium-energy beam transport (MEBT), particularly its chopping system elements for creating various bunch structures.
arXivarXiv · · February 5, 2015
0
Project X: Accelerator Reference Design
S. D. HolmesR. Alber…L. Prost
This paper presents the conceptual design of Project X, a high-intensity proton accelerator facility at Fermilab, intended to support a world-leading Intensity Frontier physics program over the next two decades. It covers performance goals, accelerator physics design, and the technological basis for the facility. Part 1 of a three-volume set, with Parts 2 and 3 available separately.
arXivarXiv · · June 20, 2013
0
Design of MEBT for the Project X Injector Experiment at Fermilab
A. ShemyakinC. BaffesA. ChenY. EidelmanB. HannaV. LebedevS. NagaitsevJ.-F. OstiguyR. PasquinelliD. PetersonL. ProstG. Saewert  +7
This paper presents the Medium Energy Beam Transport (MEBT) design for the Project X Injector Experiment (PXIE) at Fermilab, which will form a 1 mA H- beam with an arbitrary selected bunch pattern from a 5 mA, 162.5 MHz CW train. The MEBT at 2.1 MeV diverts undesired bunches to an absorber using kickers; the development of these elements is described.
arXivarXiv · · January 31, 2013
0
Effect of secondary ions on the electron beam optics in the Recycler Electron Cooler
A. ShemyakinL. ProstG. Saewert
The Recycler Electron Cooler uses a 4.3 MeV DC electron beam to cool antiprotons, but its efficiency is sensitive to ion neutralization. By interrupting the beam for 1–30 µs at up to 40 Hz to clear ions, the authors show that accumulated ions significantly affect the beam optics. At 0.3 A, removing ions increases the longitudinal cooling rate by a factor of about two.
arXivarXiv · · July 16, 2012
0
Frequent collaborators
A. Shemyakin (20)
B. Hanna (13)
J.-P. Carneiro (12)
V. Scarpine (12)
A. Chen (8)
R. Andrews (7)
A. Saini (6)
G. Saewert (6)
C. Baffes (6)
J. Steimel (6)
M. Alvarez (5)
A. Warner (4)