MCP
NS

N. Solyak

35 papers in the library

Papers

30
Status of the International Linear Collider
Y. AbeS. Arai…N. Solyak
This paper reports the status of the International Linear Collider (ILC) as considered for construction in Japan, providing an updated cost estimate for the machine at $\sqrt{s}=250\,\mathrm{GeV}$ along with descriptions of engineering progress and the situation in Japan. It is submitted to inform the European Strategy discussion, while the physics case is presented in a separate joint document for all Linear Collider projects.
arXivarXiv · · May 16, 2025
0
8
Gridded RF Gun Design for SRF Linac Applications
I. GoninC. EdwardsS. KazakovT. KhabiboullineT. NicolA. SainiN. SolyakJ.C.T. ThangarajV. YakovlevM. CurtisK. Gunther
This paper presents a thermionic gridded RF gun built into the first cavity of a 250 keV injector for a Nb3Sn conduction cooled SRF linac. The gun generates 2 mA, short electron bunches for a 20 kW, 10 MeV, 1.3 GHz CW one-cavity linac. Perveance measurements agree well with design parameters, and the beam is matched to the injector to avoid current interception in the SRF cavity.
arXivarXiv · · September 11, 2024
0
Beam Dynamics simulations for ERDC project -- SRF linac for industrial use
N. SolyakI. GoninA. SainiV. YakovlevC. EdwardsJ.C.ThangarajR. KostinC. Jing
This paper reports beam dynamics simulations for a compact, conductively cooled SRF industrial linac (up to 10 MeV, 1 MW). The injector design employs a normal-conducting RF gun with a thermal gridded gun integrated into the first cell of multicell cavities. Simulations using MICHELLE and ASTRA show that the beam reaches ~250 keV, enabling lossless bunch trapping in a TESLA-like 1.3 GHz cavity. A short solenoid at the injector end controls transverse beam size to match the cryomodule extraction system and reduce charge losses.
arXivarXiv · · September 11, 2024
0
Design, Manufacturing, Assembly, and Lessons Learned of the Pre-production 325 MHz Couplers for the PIP-II Project at Fermilab
J. HelsperS. WallonD. PassarelliD. LonguevergneS. KazakovN. Solyak
This paper reports the design, manufacturing, and assembly of five 325 MHz high-power couplers for the PIP-II project's pre-production Single Spoke Resonator Type-II cryomodule at Fermilab. The coupler design includes optimizations from the previous generation, and is procured by both Fermilab and IJCLAB. The paper covers the entire coupler life cycle and presents lessons learned at each stage.
arXivarXiv · · July 11, 2023
0
Transportation Fatigue Testing of the pHB650 Power Coupler Antenna for the PIP-II Project at Fermilab
J. HelsperS. ChandrasekaranJ. HolzbauerN. Solyak
This paper presents an experimental cyclic stress test to assess the robustness of the new pHB650 power coupler antenna designed for the PIP-II project. The test evaluates the antenna's ability to withstand shocks from international cryomodule shipment, specifically focusing on the coupler ceramic window and surrounding brazes. The study details the methods, setup, and results, establishing a qualification procedure for the antenna before shipment.
arXivarXiv · · July 11, 2023
0
Design, Manufacturing, Assembly, Testing, And Lessons Learned Of The Prototype 650 Mhz Couplers
J. HelsperS. ChandrasekaranN. SolyakS. KazakovK. PremoG. WuF. FurutaJ. OzelisB. Hanna
This paper reports the design, manufacturing, assembly, testing, and conditioning of six prototype 650 MHz high-power couplers for the PIP-II project's HB650 cryomodule at Fermilab. It describes design optimizations relative to the previous generation and documents lessons learned at each stage of the coupler life-cycle, providing a practical reference for future coupler production.
arXivarXiv · · September 2, 2022
0
An 8 GEV Linac As The Booster Replacement In The Fermilab Power Upgrade
D. NeufferS. BelomestnykhM. ChecchinD. JohnsonS. PosenE. PozdeyevV. PronskikhA. SainiN. SolyakV. Yakovlev
This paper proposes a pulsed 8 GeV superconducting radio-frequency (SRF) linac to replace the existing Booster at Fermilab, enabling Main Injector beam power above 2.5 MW for the DUNE experiment. The Booster Replacement Linac (BRL) would take the ~1 GeV beam from the PIP-II linac, accelerate it to ~2 GeV in a 650 MHz SRF linac, and then to ~8 GeV in a 1300 MHz pulsed SRF linac, using recent advances in SRF technology to produce an H⁻ beam for injection into the Recycler Ring or Main Injector.
arXivarXiv · · August 24, 2022
0
3
Future Collider Options for the US
P. C. BhatS. Jindariani…N. Solyak
This white paper for the Snowmass/P5 process argues that U.S. leadership in particle physics requires both strong partnership in next-generation collider projects abroad and exploration of hosting a future collider domestically. It briefly reviews proposed foreign collider projects, outlines options for a U.S.-based collider, and calls for initiating an integrated R&D program to support these objectives.
arXivarXiv · · March 15, 2022
0
27
Design of a medium energy, high average power superconducting e-beam accelerator for environmental applications
R.C. DhuleyI. GoninK. ZellerR. KostinS. KazakovB. CoritonT. KhabiboullineA. SukhanovV. YakovlevA. SainiN. SolyakA. Sauers  +1
This paper presents the design of a 10 MeV, 1 MW electron beam accelerator using superconducting radiofrequency (SRF) cavity technology with cryocooler conduction cooling, achieving over 90% RF-to-beam efficiency for industrial wastewater treatment. The conduction-cooled SRF design eliminates the need for a liquid helium bath, reducing complexity. The accelerator can treat up to 12 million gallons of wastewater per day, with an estimated capital cost of ~$8M and material processing cost of ~13.5 cents/ton/kGy.
arXivarXiv · · December 16, 2021
0
LCLS-II-HE verification cryomodule high gradient performance and quench behavior
S. PosenA. Cravatta…N. Solyak
The LCLS-II-HE verification cryomodule, an 8-cavity 1.3 GHz assembly tested at Fermilab, achieved a 200 MV continuous-wave acceleration voltage (average gradient 24.1 MV/m) and an average Q0 of 3.0×10¹⁰, both exceeding specifications. Its novel nitrogen-doped cavities were processed to manage sporadic quenches attributed to multipacting, supported by vertical test experiments. The module showed no field emission up to each cavity's maximum gradient, validating the cavity treatment and processing protocol for production.
arXivarXiv · · October 27, 2021
0
Ring-Based Electron Cooling System for the EIC
V. LebedevS. NagaitsevA. BurovV. YakovlevI. GoninI. TerechkineA. SainiN. Solyak
The report describes an electron cooling system for the Electron-Ion Collider (EIC) that uses a proven induction linac technology with a dc electron beam. The system circulates 50-100 A electron beams in a cooler ring for 5 ms, injecting a new pulse every 5 ms to maintain continuous cooling. It covers the full proton beam energy range (100-270 GeV) and achieves emittance cooling times under 1-2 hours. A 10-ms cycle option reduces cooling rates by approximately 30%.
arXivarXiv · · October 1, 2020
0
Achievement of Ultra-High Quality Factor in Prototype Cryomodule for LCLS-II
G. WuA. GrassellinoE. HarmsN. SolyakA. RomanenkoC. GinsburgR. Stanek
The Fermilab prototype cryomodule for LCLS-II achieved an unprecedented cavity quality factor of $3.0 \times 10^{10}$ at nominal voltage, a key cost driver for continuous-wave SRF linacs. This result was enabled by the first implementation of nitrogen doping cavity treatment, high-performance magnetic shielding (ambient field $<5$ mG at the cavity wall), and high mass flow cooldown to improve flux expulsion—all integrated into a single cryomodule for the first time.
arXivarXiv · · December 21, 2018
0
The Role of Magnetic Flux Expulsion to Reach Q0>3x10^10 in SRF Cryomodules
S. PosenG. WuE. HarmsA. GrassellinoO. S. MelnychukD. A. SergatskovN. SolyakA. PalczewskiD. GonnellaT. Peterson
This paper reports the first accelerator implementation of procedures that prevent magnetic flux from being trapped in bulk niobium SRF cavities during cooldown, which otherwise degrades the quality factor. By applying high-temperature heat treatment and maintaining a spatial thermal gradient over the cavity surface during the superconducting transition, near-full flux expulsion is achieved. In LCLS-II cryomodules, this combination substantially improves performance, enabling many cavities to reach or exceed $Q_0 \sim 3 \times 10^{10}$.
arXivarXiv · · December 10, 2018
0
Commissioning And First Results From The Fermilab Cryomodule Test Stand
E.R. HarmsM. Awida…N. Solyak
A new cryomodule test stand, CMTS1, for Superconducting Radiofrequency (SRF) cavities has been commissioned at Fermilab. The first device tested is the prototype 1.3 GHz cryomodule assembled for LCLS-II. The paper reports the facility's demonstrated capabilities, commissioning steps, first test results, and future plans.
arXivarXiv · · May 7, 2018
0
5
Initial Beam Dynamics Simulations of a High-Average-Current Field-Emission Electron Source in a Superconducting RadioFrequency Gun
O. MohsenI. GoninR. KephartT. KhabiboullineP. PiotN. SolyakJ. C. ThangarajV. Yakovlev
This paper demonstrates the viability of a high-power electron beam source that couples a field-emission cathode with a superconducting radio-frequency (SRF) cavity. Beam-dynamics simulations show that a 1+1/2-cell SRF gun can produce an average beam power of approximately 300 kW, supporting applications requiring high-power electron beams.
arXivarXiv · · January 6, 2018
0
6
Analysis and Measurement of the Transfer Matrix of a 9-cell 1.3-GHz Superconducting Cavity
A. HalavanauN. EddyD. EdstromE. HarmsA. LuninP. PiotA. RomanovJ. RuanN. SolyakV. Shiltsev
This paper presents the measurement of the transfer matrix of a 9-cell 1.3-GHz superconducting cavity, originally developed for linear collider applications, at the Fermilab FAST facility. The transfer matrix, which characterizes the cavity's beam dynamics, is obtained analytically and via numerical simulation, and the experimental results are shown to agree with both calculations. This work provides a validated experimental characterization of the cavity's transfer matrix.
arXivarXiv · · January 27, 2017
0
11
Untrapped HOM Radiation Absorption in the LCLS-II Cryomodules
K. BaneC. NantistaC. AdolphsenT. RaubenheimerA. SainiN. SolyakV. Yakovlev
This report estimates the effectiveness of ceramic absorbers, placed at 70 K between cryomodules, in absorbing higher-order-mode (HOM) power generated by the LCLS-II continuous-wave beam. Because the short bunch length extends the beam spectrum into the terahertz range, unabsorbed HOM power would be deposited at the expensive 2 K operating temperature of the superconducting cavities. Two kinds of calculation are performed to determine the power that must still be removed at 2 K.
arXivarXiv · · November 6, 2014
0
Status and Opportunities at Project X: A Multi-MW Facility for Intensity Frontier Research
S. D. HolmesM. KaducakR. KephartI. KourbanisV. LebedevS. MishraS. NagaitsevN. SolyakR. Tschirhart
Project X is a multi-megawatt proton facility under development at Fermilab for Intensity Frontier physics. In its current R&D stage, the facility focuses on front-end and superconducting RF acceleration technologies, with staged implementation design concepts. This paper reviews the status of Project X's conceptual development and its associated R&D programs, which support elementary particle and nuclear physics along with potential materials and energy research applications.
arXivarXiv · · September 19, 2014
0
The Project-x Injector Experiment: A Novel High Performance Front-end For A Future High Power Proton Facility At Fermilab
S. NagaitsevS. HolmesD. JohnsonM. KaducakR. KephartV. LebedevS. MishraA. ShemyakinN. SolyakR. StanekV. YakovlevP. Ostroumov  +4
The Project X Injector Experiment (PXIE) is a novel front-end test facility for the proposed multi-MW proton facility at Fermilab. It integrates an H- ion source, a CW 2.1-MeV RFQ, and two SRF cryomodules delivering up to 25 MeV at 1 mA average current. PXIE's primary goal is to validate the front-end concept through integrated systems testing, thereby reducing a key technical risk for Project X and demonstrating technologies applicable beyond the project.
arXivarXiv · · September 18, 2014
0
7
Higgs Working Group Report of the Snowmass 2013 Community Planning Study
S. DawsonA. Gritsan…N. Solyak
This Snowmass 2013 working group report identifies the key elements of a precision Higgs physics program and documents the physics potential of future experimental facilities. The central contribution is a comprehensive projection of measurement capabilities for Higgs couplings, the Higgs self-coupling via double Higgs production, its quantum numbers and $CP$-mixing, mass, total width, and searches for additional Higgs bosons. These projections are derived from detailed studies of seven future colliders, including the HL-LHC, ILC, CLIC, a Muon Collider, and a 100 TeV VLHC, providing a unified benchmark for the field.
arXivarXiv · · October 31, 2013
0
84
Project X: Accelerator Reference Design
S. D. HolmesR. Alber…N. Solyak
This paper presents the conceptual design of Project X, a high-intensity proton accelerator facility at Fermilab, intended to support a world-leading Intensity Frontier physics program over the next two decades. It covers performance goals, accelerator physics design, and the technological basis for the facility. Part 1 of a three-volume set, with Parts 2 and 3 available separately.
arXivarXiv · · June 20, 2013
0
Design of MEBT for the Project X Injector Experiment at Fermilab
A. ShemyakinC. Baffes…N. Solyak
This paper presents the Medium Energy Beam Transport (MEBT) design for the Project X Injector Experiment (PXIE) at Fermilab, which will form a 1 mA H- beam with an arbitrary selected bunch pattern from a 5 mA, 162.5 MHz CW train. The MEBT at 2.1 MeV diverts undesired bunches to an absorber using kickers; the development of these elements is described.
arXivarXiv · · January 31, 2013
0
PXIE: Project X Injector Experiment
P.N. OstroumovS.D. HolmesR.D. KephartJ.S. KerbyV.A. LebedevC.S. MishraS. NagaitsevA.V. ShemyakinN. SolyakR.P. StanekD. Li
The paper describes the Project X Injector Experiment (PXIE), a prototype being built at Fermilab to validate the front end of the proposed multi-MW Project X proton facility. PXIE includes an H- ion source, a CW 2.1-MeV RFQ, and two SC cryomodules providing up to 30 MeV energy gain at 1 mA average beam current. Successful operations will demonstrate novel front-end technologies and minimize the primary technical risk of Project X.
arXivarXiv · · January 30, 2013
0
PXIE Optics and Layout
V.A. LebedevS. NagaitsevJ.-F. OstiguyA.V. ShemyakinB.G. ShteynasN. Solyak
This paper presents the optics and layout of the Project X Injector Experiment (PXIE), a prototype for the Project X front end that accelerates a 1 mA CW beam to about 25 MeV. PXIE deviates from the current front-end concept by using a reduced number of kickers for bunch chopping and adding an RF separator in the diagnostic section to study extinction of removed bunches. The design aims to validate Project X and reduce technical risks through operational experience.
arXivarXiv · · January 30, 2013
0
SCREAMm - modified code SCREAM to simulate the acceleration of a pulsed beam through the superconducting linac
Yu. EidelmanS. NagaitsevN. Solyak
The code SCREAM was modified and improved to simulate pulsed beam acceleration through a superconducting linac. The corrections fix misprints in the original formulae and replace them with a more realistic vector-sum expression. A model of Lorentz-force detuning (LFD) is developed and will be incorporated. The modifications provide a GUI for quick parameter changes, real-time plot control during simulation, and a collection of graphs for illustrating results.
arXivarXiv · · September 19, 2012
0
Broad-band chopper for a CW proton linac at Fermilab
E. Gianfelice-WendtV. A. LebedevN. SolyakS. NagaitsevD. Sun
This paper discusses the requirements and technical limitations of a bunch-by-bunch chopper designed for a CW proton linac at Fermilab (Project X). The central contribution is a broad-band chopper that can selectively remove individual bunches from the continuous beam, enabling precise control of the beam structure for downstream experiments. The analysis covers the design challenges and constraints imposed by the CW operation.
arXivarXiv · · August 13, 2012
0
A new approach to calculate the transport matrix in RF cavities
Yu. EidelmanN. MokhovS. NagaitsevN. Solyak
This paper presents a realistic method for calculating the transport matrix in RF cavities by jointly solving the longitudinal and transverse equations of motion for a charged particle in the linac's electromagnetic field. The field is defined by the measured or calculated distribution of the longitudinal electric field component on the axis. The new approach achieves complete agreement with tracking results from the ASTRA code for a TESLA-type cavity and will be implemented into the MARS15 code.
arXivarXiv · · August 9, 2012
0
Intrabeam stripping in H- Linacs
V. LebedevN. SolyakJ.-F. OstigyA. AlexandrovA. Shishlo
This paper identifies intrabeam stripping as the dominant cause of beam loss in the superconducting section of the SNS H- linac, a loss mechanism that multiparticle tracking could not explain. The authors present experimental observations of the loss and its dependence on machine parameters, showing consistency with the stripping of H- ions through intrabeam particle collisions. Corresponding analytical estimates are provided to support the proposed mechanism.
arXivarXiv · · July 23, 2012
0
Submicron multi-bunch BPM for CLIC
H. SchmicklerL. SobyA. LuninN. SolyakM. Wendt
This paper presents a common-mode free cavity BPM developed for the CLIC Main Linac multi-bunch regime. The design achieves high spatial and time resolution to meet simultaneous beam position and bunch timing requirements. The work covers the design concept, numerical analysis, tolerance and error studies, and simulated signal response under multi-bunch excitation.
arXivarXiv · · July 19, 2012
0
A high resolution cavity BPM for the CLIC Test Facility
N. ChritinH. SchmicklerL. SobyA. LuninN. SolyakM. WendtV. Yakovlev
We present a cavity BPM prototype for the CLIC Main Linac, consisting of a waveguide-loaded dipole mode resonator and a monopole mode reference cavity, both operating at 15 GHz to match CLIC Test Facility bunch frequencies. The design concept, numerical analysis, and practical considerations are discussed toward achieving high-resolution beam position measurement.
arXivarXiv · · July 19, 2012
0
Frequent collaborators
V. Yakovlev (15)
S. Nagaitsev (12)
A. Saini (8)
V. Lebedev (7)
I. Gonin (6)
T. Khabiboulline (6)
S. Posen (5)
S. Kazakov (5)
S. Mishra (5)
G. Wu (4)
A. Grassellino (4)
E. Harms (4)