Stochastic Load Balancing with Machine Reservations
David Alemán EspinosaNaveen GargSISharat IbrahimpurNONeil OlverChaitanya Swamy
David Alemán Espinosa
Naveen Garg
SISharat Ibrahimpur
NONeil Olver
Chaitanya Swamy
+5
This paper introduces a two-stage stochastic load balancing model that bridges non-adaptive and omniscient policies. In the first stage, only job-size distributions are known, and each job reserves at most k machines. In the second stage, after sizes are realized, each job is assigned to one of its reserved machines. The goal is to minimize expected makespan. The central result is that on identical machines, a 2-reservation achieves a constant-factor approximation to the omniscient optimum, a "power-of-two-choices" result. For related machines, a 2-reservation approximates the adaptive optimum within a constant factor, and other approximations are provided.

arXiv ·
· July 28, 2026