MCP
arXivarXiv
Preprint
Published: November 9, 2001
physics.acc-ph

Status Update on the ISAC Control System

Abstract
Implementation and commissioning of the EPICS based control system for the ISAC radioactive beam facility was completed. The target ion source, mass separator, and low-energy beam-lines started beam production for experiments. In parallel, controls for the accelerator system, a radio-frequency quadrupole followed by a drift-tube linac, and several high-energy beam-lines were implemented and commissioned. The number of controlled devices more than doubled since the last report. An overview of relational database usage, software engineering and quality control methods used will be given.
0
AI overview
Reviews
Citation graph
Structured
This paper does not have an AI preview yet
Rating
No ratings yet
Rate
Community rating
—
/ 5
No ratings yet
Rating
—
Soundness
—
Presentation
—
Contribution
—
Confidence
—
Discussion
Top
Newest
Questions
Replication
Author
No comments yet — be the first