MCP
RW

R. Webber

4 papers in the library

Papers

4
High Gradient Tests of the Fermilab SSR1 Cavity
T. KhabiboullineC. M. Ginsburg…R. Webber
This paper reports on the high-gradient performance of Fermilab's SSR1 superconducting single-spoke resonator ($\beta=0.22$) for low-beta ion acceleration. The first two cavities achieved excellent results during cold tests in the vertical test station, and one dressed cavity was successfully tested in the horizontal test station. These results support the ongoing production of ten industrial cavities and the eight-cavity cryomodule for the PIXIE project, with cold test results from the new cavities presented in the poster.
arXivarXiv · · January 23, 2013
0
Status and specifications of a Project X front-end accelerator test facility at Fermilab
J. SteimelR. WebberR. MadrakD. WildmanR. PasquinelliE. Evans-Peoples
This paper reports the construction and operational status of an accelerator test facility at Fermilab for Project X. The facility supports component development through beam tests and 325 MHz or 650 MHz RF power. It currently includes an H- beam line, a 325 MHz superconducting cavity test facility, a 325 MHz pulsed RF source, and a 650 MHz CW RF source. Specific Project X components to be tested are also discussed.
arXivarXiv · · August 16, 2012
0
Operational aspects of the Main Injector large aperture quadrupole (WQB)
W. ChouL. Bartelson…R. Webber
The WQB (large aperture quadrupole) project at Fermilab's Main Injector designed, fabricated, and bench-tested nine magnets, with seven installed and two serving as spares. The aperture increase met the design goal with minimal lattice perturbation, raising machine acceptance in the injection and extraction regions from 40pi to 60pi mm-mrad. This paper reports on their operation and performance.
arXivarXiv · · February 26, 2008
0
5
Synchronization of the Fermilab Booster and Main Injector for Multiple Batch Injection
R. ZwaskaS. KoppW. PellicoR. Webber
The paper presents a synchronization mechanism for the Fermilab Booster and Main Injector that enables multiple batch injection, required for future operation with six or more Booster batches. The method advances or retards the longitudinal position of the Booster beam by actively manipulating its radial position via feedback during acceleration, avoiding beamline radioactivation.
arXivarXiv · · July 1, 2004
0
Frequent collaborators
R. Madrak (2)
T. Khabiboulline (1)
C. M. Ginsburg (1)
I. Gonin (1)
O. Melnychuk (1)
J. Ozelis (1)
Y. Pischalnikov (1)
L. Ristori (1)
A. Rowe (1)
D. A. Sergatskov (1)
A. Sukhanov (1)
I. Terechkine (1)