MCP
arXivarXiv
Preprint
Published: July 1, 2004
physics.acc-ph

Synchronization of the Fermilab Booster and Main Injector for Multiple Batch Injection

Abstract
To date, the 120 GeV Fermilab Main Injector accelerator has accelerated a single batch of protons from the 8 GeV rapid-cycling Booster synchrotron for production of antiprotons for Run II. In the future, the Main Injector must accelerate 6 or more Booster batches simultaneously; the first will be extracted to the antiproton source, while the remaining are extracted for the NuMI/MINOS (Neutrinos at the Main Injector / Main Injector Neutrino Oscillation Search) neutrino experiment. Performing this multi-batch operation while avoiding unacceptable radioactivation of the beamlines requires a previously unnecessary synchronization between the accelerators. We describe a mechanism and present results of advancing or retarding the longitudinal progress of the Booster beam by active feedback radial manipulation of the beam during the acceleration period.
0
AI overview
Reviews
Citation graph
Structured
This paper does not have an AI preview yet
Rating
No ratings yet
Rate
Community rating
—
/ 5
No ratings yet
Rating
—
Soundness
—
Presentation
—
Contribution
—
Confidence
—
Discussion
Top
Newest
Questions
Replication
Author
No comments yet — be the first